Miners watch as the drill machine 'Sissi' breaks through the rock at the final section Faido-Sedrun, at the construction site of the NEAT Gotthard Base Tunnel, on Oct. 15. With a length of 57 km (35 miles) crossing the Alps, the world's longest train tunnel should become operational at the end of 2017.
PHOTO: Reuters