Menu
Share
Share this story
Close X
 
Switch to Desktop Site

October 15, 2010

Image

Image 2 of 13

 

Miners watch as the drill machine 'Sissi' breaks through the rock at the final section Faido-Sedrun, at the construction site of the NEAT Gotthard Base Tunnel, on Oct. 15. With a length of 57 km (35 miles) crossing the Alps, the world's longest train tunnel should become operational at the end of 2017.

PHOTO: Reuters

Next Image Previous Image

Image 2 of 13

 
About these ads

Share